After nearly two months of upheaval were now on the home leg of finishing the kitchen remodel. We’ve still got a list of tuit’s to do like , Some plastering then the Limestone wall tiles go on the walls, some glass shelves missing from several of the wall units as is the frosted glass doors for the same units, the fridge freezer has to be got back into place (four man job) the hob top hood is still missing, the blinds have to be replaced, paint the rest of the walls and doorways, and the tap in the picture has to be changed to a bridged lever type.
Hopefully one more week should see it finished







